We had our weekly dredging meeting today. The dredgers have had some breakdowns over the last week. Seems the material in the marina is a bit tough on their equipment and pipe. But they think things are progressing well and plan to be wrapped up with the actual dredging my mid-June. This means it is seriously time to start working on boats and prepare to put them back in the water. We will need ALL boats in the parking lot to be put back in the water or removed from the marina within 60 days of dredging completion. This does not include boats that have been in dry storage before all this low water started. Thanks| Dave Dave Shearer Harbor Master Great Salt Lake State Marina Antelope Island State Marina 801-209-9142