There is much dredging to be done but we are rapidly nearing the end of the project. S&L is starting to reassemble E and D dock. This does not mean those docks will be ready to use after being reassembled. I don’t expect those docks to be open up until early to mid-July.
The dredgers are focusing on the mouth of the marina as well as the hump outside all the way to the navigation buoys outside the mouth. Please do not go out today or tomorrow if you don’t have to. The pipe and the dredge are blocking most of the mouth. The mouth will be cleared each day by 7:30pm. They are concentrating on this area now so that it is open and deep for Sailfest Saturday and Sunda.
Thanks
Dave
Dave Shearer
Harbor Master
Great Salt Lake State Marina
Antelope Island State Marina
801-209-9142